How to create a new project
These steps are for the Priority Matrix web app, which is also what you see inside Microsoft Teams and Outlook. The other Priority Matrix apps work in a similar way.- In the left panel, click the Project button with the plus icon ("Add a new project in matrix format"). On a phone-sized screen, open the Projects view and tap the round + button at the bottom right instead.
- The Choose a project template screen opens. Pick how you want to start:
- Blank project: start from scratch and choose a method (see below).
- My Templates: templates that you or your teammates saved from existing projects.
- Public Templates: ready-made projects for common processes.
- Create with AI: describe your goal, and Priority Matrix drafts the project for you. If your account administrator has turned AI off, this tab shows a message saying AI is not enabled in your account.
- Import CSV: create the project from a spreadsheet. See How to Import CSV Files into Priority Matrix Projects.
- If you chose Blank project, fill in the project details:
- Project Name, for example "Welcoming a new team member".
- Notes (optional): what the project is for.
- Method: the quadrant layout to start with, such as Priority Matrix, Eisenhower Matrix, GTD Method or SWOT Analysis. Tick Teach me about this method if you'd like a short guide after the project is created.
- Color Theme: the quadrant colors.
- Click Add Project. Your new matrix opens, ready for tasks.
How to set up an Eisenhower Matrix
The Eisenhower Matrix sorts tasks by two questions: is it important, and is it urgent? To create one:- Start a new project as described above and choose Blank project.
- In Method, choose Eisenhower Matrix.
- Give the project a name and click Add Project.
| Q1 (top left): Important and Urgent Do these first. |
Q2 (top right): Important but Not Urgent Plan time for these. |
| Q3 (bottom left): Not Important but Urgent Delegate these if you can. |
Q4 (bottom right): Not Important and Not Urgent Drop or postpone these. |
How to rename quadrants and change colors
You can change any project's name, quadrant names and quadrant colors after you create it, for example to turn an existing project into an Eisenhower Matrix or to use your own quadrant names:- Open your list of projects and click the project. Its details panel appears on the right side of the screen.
- Click a quadrant title to rename it.
- Click the small matrix icons to pick a different quadrant color.
Related questions
- How do I save a project as a template and share it with my team?
- How do I group projects into a dashboard with subprojects?
- How do I organize projects with tags?
- How do I archive or delete a project?
- How many projects can I have? The free tier allows up to 5 projects, the PM Essential student and teacher license up to 25, and the Pro plan up to 100. PM Collaborate, Business Class and Enterprise have unlimited projects.